Skanska
HV Cable Encasements
Adept Contracts, recently completed the second phase of High Voltage cable encasement systems in the basement areas of the Energy Centre at Astra Zeneca’s New Site, the Laureate Project. This cable encasement system developed by Kemwell International Ltd is the only tested system that complies with the latest requirements of BS8519:2010. The encasement system is tested to give 2 hours full fire protection (insulation and Integrity) in a fire situation and will maintain the internal encasement temperature at below 180 deg C, as required under BS8519:2010.