Laureate Project, Astra Zeneca | High Voltage Cable Encasement
1291
portfolio_page-template-default,single,single-portfolio_page,postid-1291,bridge-core-1.0.5,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-12.0.1,qode-theme-bridge,wpb-js-composer js-comp-ver-5.1,vc_responsive
 

Laureate Project, Astra Zeneca, Cambridge

Tags
Fire Protection, High Voltage Cable Encasement
Main Contractor:

Skanska

Installation:

HV Cable Encasements

Adept Contracts, recently completed the second phase of High Voltage cable encasement systems in the basement areas of the Energy Centre at Astra Zeneca’s New Site, the Laureate Project. This cable encasement system developed by Kemwell International Ltd is the only tested system that complies with the latest requirements of BS8519:2010. The encasement system is tested to give 2 hours full fire protection (insulation and Integrity) in a fire situation and will maintain the internal encasement temperature at below 180 deg C, as required under BS8519:2010.