London Paddington station
627
portfolio_page-template-default,single,single-portfolio_page,postid-627,bridge-core-3.2.0,qodef-qi--no-touch,qi-addons-for-elementor-1.7.6,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-30.6.1,qode-theme-bridge,qode_header_in_grid,qode-portfolio-single-template-8,wpb-js-composer js-comp-ver-7.7.2,vc_responsive,elementor-default,elementor-kit-7
 

London Paddington station

MAIN CONTRACTOR: Costain-Skanska
INSTALLATION: Fire Rated hoardings and Passive Fire Protection Systems

 

Adept Contracts have been providing Passive fire protection services to the Bakerloo Line link project over the past year. The Main contractors are Costain & Skanska who have formed the Bakerloo Line Link Joint Venture. (BBLJV). This scheme will link the Bakerloo Line with Paddington’s new Crossrail Station. In addition to the firestopping Adept has supplied and installed fire rated hoarding systems that are compliant with the requirements of Section 12 stations.

Date
Category
RAIL & PUBLIC TRANSPORT
Tags
fire rated hoardings, fire stopping, passive fire protection